• slazer2au@lemmy.world
    link
    fedilink
    English
    arrow-up
    19
    ·
    10 hours ago

    You don’t try company wide.

    Prepare a feasibility study on the merits on giving choice to power users without sacrificing security or increasing complexity. A multi departmental working group should be established to review the merits of the new platform, while a control group should also be established to monitor how existing solutions perform.
    Once completed a multi stage rollout plan should be compiled by a different multi departmental group to make sure all workflows are covered in the new system.

    • apftwb@lemmy.world
      link
      fedilink
      arrow-up
      5
      ·
      edit-2
      8 hours ago

      This guy corporates

      I have been down that path before with Obsidian and LaTeX (Obsidian was a success and LaTeX was meh). The first step is getting the executables white listed and Its always a PITA with our security team. I need to first convince them it is worth the study, which is always hard because they are not power users. Feature lists help. Win11 explorer being dogshit also helps.