Route 286, which runs from Greenwich town centre to Queen Mary Hospital in Sidcup via Eltham, will be converted to double-decker buses when a new contract with Go-Ahead London begins on July 11.
But fewer buses will be required – 11 at peak times rather than 14 now – so the route is due to be reduced in frequency from every 12 minutes to every 15 minutes.
You must log in or register to comment.
Don’t forget that this is all thanks to the Tories cutting TfL’s operating grant back in 2018:



